Encore Electric Celebrates New Prefabrication and Tool Center with Ribbon Cutting Ceremony
Encore Electric has officially opened its new Prefabrication and Tool Center in Aurora, Colorado with a ribbon cutting ceremony. They brought nearly 50 jobs to the community via the new prefabrication and tool center and plans to continue to expand the center in the coming months.
Designed for better collaboration, the center provides the space needed to work in a controlled environment, to lessen onsite manpower, test equipment safely, remove waste from jobsites and landfills, optimize a consistent workflow, and provides Encore a place to safely train apprentices with a hands-on approach to better prepare people for their future in the field.
The 67,000 square foot facility is where many Encore Electric apprentices begin their electrical careers. The facility is also grounds for planning and creating technology to achieve and surpass the expectations of their customers, while developing their workforce in their career paths.
Image - From left to right: Jonathan Woodward, Director of Development, Aurora Economic Development Council; Jose Saenz, Encore Electric Tool Manager; Andy Gordon, Encore Electric Chief Operating Officer; Sam Hamilton, Encore Electric Director VDC and Prefabrication; Mayor Mike Coffman, City of Aurora; Marlin Linder, Encore Electric Vice President; Willis Wiedel, Encore Electric President; Jeremiah Harris, Encore Electric Technology Systems Engineer